Alt US 19 (Seminole Boulevard) Repaving from 53rd Avenue N to 101st Avenue N 436485-1-52-01

Project Details
Work TypeRepaving
PhaseCompleted
LimitsFrom 53rd Avenue North to 101st Avenue North
Project StartMarch 2020
Length3.1 miles
CitySeminole
CountyPinellas
RoadAlt US 19 Seminole Boulevard
Construction Cost$6.8 million
Estimated CompletionSpring 2021
ContractorPreferred Materials, Inc.

About

FINAL ACCEPTED ON MARCH 12, 2021

This project will repave Alt. US 19 (Seminole Boulevard) from south of 53rd Avenue N to north of 101st Avenue N. in Seminole.

Construction is anticipated to finish in the spring of 2021.

Contact Information

Project Information

Sarah Gansz 727-575-8300

Sarah.Gansz@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us