Tampa Bay Florida Department of Transportation
SR 694 (Gandy Boulevard) Repaving from west of US 19 to Grand Avenue 441650-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom west of US 19 to east of Grand Ave
Project StartSummer 2023
Length.9 miles
CityPinellas Park
CountyPinellas
RoadGandy Boulevard Park Boulevard SR 694
Construction Cost$7.5 million
Estimated CompletionFall 2024
ContractorAjax Paving Industries of Florida
About
As of November 13, 2024, all construction activities associated with this project have been completed.
This project will repave SR 694 (Gandy Boulevard/ Park Boulevard) between west of US 19 and Grand Avenue in Pinellas Park. The ramps to US 19 and the frontage roads will also be repaved. Gaps in the sidewalks will be eliminated and intersection lighting will be upgraded.
Construction is underway and expected to be complete in the fall of 2024.
Contact Information
Project Information
Maddie Griffin 727-575-8334
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us