US 19 (34th Street) Repaving from SR 682 (54th Avenue S.) to 22nd Avenue N. 440246-1-52-01

Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom SR 682 (54th Ave S) to 22nd Ave. N
Project StartMarch 2023
Length5 miles
CitySt. Petersburg
CountyPinellas
Road34th Street South US 19
Construction Cost$23.2 million
Estimated CompletionFall 2025
ContractorPreferred Materials, Inc.

Contact Information

Project Information

Bryce Johns 727-575-8334 Bryce.Johns@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us

About

As of September 15, 2025, all construction activities associated with this project have been completed.

This project repaved US 19 (34th St.) between 54th Avenue South and 22nd Avenue North.

Highway lighting was replaced at the signalized intersections, the sidewalk was widened to eight feet on both sides of the roadway where possible, and medians along the corridor were also modified to enhance safety.

Construction finished during fall 2025.

*Construction cost includes original construction contract amount plus approved contract changes. It does not include inspection oversite.