| Project Details |
| Work Type | Operational and Safety Improvements |
|---|
| Phase | Design |
|---|
| Limits | Air Cargo Road from Tampa Bay Boulevard to south of Orient Street; Tampa Bay Boulevard from Lois Avenue to North Dale Mabry Highway |
|---|
| Length | 0.75 miles |
|---|
| City | Tampa |
|---|
| County | Hillsborough |
|---|
This project includes milling, resurfacing, and widening to provide two lanes in each direction along these sections of Air Cargo Road and Tampa Bay Boulevard. Other improvements include adding continuous sidewalks.
Construction activities are expected to begin 2027.
Contact Information
Design Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us