===== PAGE 1 ===== ## SR 582 (Fowler Avenue) Repaving from US 41 (Nebraska Avenue) to 50th Street 445652-1-52-01
Project Details
Work TypeRepaving
PhaseConstruction
LimitsBruce B Downs Blvd to 50th Street
Project StartLate 2026
CityTemple Terrace
CountyHillsborough
RoadFowler Avenue
Construction Cost$10.3 million
Estimated CompletionFall 2027
ContractorPreferred Materials, Inc
Contact Information
Project Information
Maricelle Venegas\n813-975-6204
Maricelle.Venegas@dot.state.fl.us
Media Contact
Kayla Mejia\n813-975-6060
Kayla.Mejia@dot.state.fl.us
Image
Map data ©2026 Google ## About This project is repaving SR 582 (Fowler Avenue) from US 41 (Nebraska Avenue) to 50th Street in Temple Terrace (Tampa), Hillsborough County. Other improvements include: - installing two midblock pedestrian crossings with signals at 14th Street and 17th Street • adding wide bike lane enhancements • constructing a new wide sidewalk - adding a 14-ft. wide paved emergency access connection from the FDOT District 7 Headquarters (McKinley Drive to 46th Street) Construction activities are expected to begin late 2026.