===== PAGE 1 =====
# SR 200 Bridge Replacement from E Spruce Drive to south of SW 137th Court 454454-1-52-01
| Project Details |
| Work Type | Bridge Replacement and Add Lanes |
| Phase | Design |
| Limits | SR 200 from E Spruce Drive to south of SW 137th Court |
| Length | 1.09 miles |
| City | Dunnellon |
| County | Citrus Marion |
| Road | SR 200 |
| Contact Information |
| Design Manager |
| Art Mariano |
| 813-975-6249 |
| Art.Mariano@dot.state.fl.us |
| Media Contact |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia | @dot.state.fl.us |
## Google
Map data ©2026
## About
This project will replace the existing SR 200 bridge over the Withlacoochee River between Citrus and Marion counties.
The project includes constructing two new, three-lane bridges in each direction of travel, removal of the existing bridge, as well as widening the existing roadway, to connect to the new bridges.