| Project Details | |
| Work Type | Bridge Replacement and Add Lanes |
|---|---|
| Phase | Design |
| Limits | SR 200 from E Spruce Drive to south of SW 137th Court |
| Length | 1.09 miles |
| City | Dunnellon |
| County | Citrus Marion |
| Road | SR 200 |
Contact Information
Design Manager
Art Mariano
813-975-6249
Art.Mariano@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia @dot.state.fl.us
This project will replace the existing SR 200 bridge over the Withlacoochee River between Citrus and Marion counties.
The project includes constructing two new, three-lane bridges in each direction of travel, removal of the existing bridge, as well as widening the existing roadway, to connect to the new bridges.