I-275 NB Exit Ramp onto Scott Street Improvements from Ashley Drive to Franklin Street
451462-2-52-01
| Project Details |
| Work Type | IntersectionImprovements |
| Phase | Design |
| Limits | I-275 NB ExitRamp onto Scott Street fromAshley Drive toFranklin Street |
| Length | 0.18 miles |
| City | Tampa |
| County | Hillsborough |
| Road | I-275 |
Contact Information
| Contact Information |
| Design Manager |
| Helena Ly | 813-975-3690 |
| Helena.Ly@dot.state.fl.us | |
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Map data ©2026 Google
## About
This project will improve the I-275 Northbound (NB) Exit Ramp onto Scott Street from Ashley Drive to Franklin Street in Tampa.
Multiple improvements will be included within the project limits.
• Adding two right turn lanes along the I-275 NB Exit Ramp to Scott Street for traffic turning onto southbound Tampa Street
• Installing a barrier wall along the right turn lanes
• Installing a signal at Tampa Street for the added right turn lanes
• Adding Intelligent Transportation Systems (ITS) devices for the new signal
• Modifying signing and pavement markings
- Modifying lighting at the intersection of Scott Street and Tampa Street
Construction is anticipated to begin Fall 2027.