SR 60 Repaving from Ben T Davis Beach to Bayport Drive 450337-1-52-01
| Project Details |
| Work Type | Milling and Resurfacing |
|---|
| Phase | Construction |
|---|
| Limits | From west of Ben T Davis Beach entrance to east of Bayport Drive |
|---|
| Project Start | September 24, 2026 |
|---|
| Length | 1.788 Miles |
|---|
| City | Tampa |
|---|
| County | Hillsborough |
|---|
| Road | Courtney Campbell Causeway SR 60 |
|---|
| Construction Cost | $7.1 million |
|---|
| Estimated Completion | Fall 2027 |
|---|
| Contractor | Preferred Materials, Inc |
|---|
| Contact Information |
| Project Information
Maricelle Venegas
813-975-6204
Maricelle.Venegas@dot.state.fl.us |
| Media Contact
Kayla Mejia
813-975-6060
Kavla.Mejia@dot.state.fl.us |
Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 450337-1-52-01)
Last Updated: 10/05/2026