PRIVATE ENGINEER'S NOTICE TO CONTRACTOR

The existence and location of any underground utility pipes, conduits or structures shown on these plans was obtained by a search of the available records. To the best of our knowledge, there are no existing utilities except as shown on these plans. The contractor is required to take due precautionary measures to protect the utility lines shown on these drawings. The contractor further assumes all liability and responsibility for the utility pipes, conduits or structures shown or not shown on these drawings. The contractor shall pothole all existing utilities to verify the location and any discrepancy between the plans shall be brought to the attention of the Design Engineer.

Contractor agrees that he shall assume sole and complete responsibility for the job site condition during the course of construction of this project, including safety of all persons and property and that this requirement shall apply continuously and not be limited to normal working hours. The contractor also agrees to defend, indemnify and hold the owner and the engineer harmless from any and all liability, real or alleged in connection with the performance of work on this project, excepting for liability arising from the sole negligence of the owner or the engineer.

ENGINEER'S SIGNATURE (Print Name) under signature line R.C.E.

R.C.E. DATE