1. Plan view shall include:
  2. North arrow, scale and 3" bar scale.
  3. Existing improvements to be shown with dashed line.
  4. Improvements to be constructed, including all joins at project boundaries; the interim conditions shall be clearly shown.
  5. Approved Street names.
  6. Centerline stationing of both streets at all intersections. The station and name of the subject street shall be shown above the leader and the station and name of the intersecting street below.
  7. Stationing along the centerline of construction should match stationing established by earlier plans.
  8. Stationing shall be marked on all construction centerlines and aligned with profile.
  9. All existing utilities - show proposed water and sewer (solid).
  10. Tract number, tract boundary, lot lines and lot numbers for each parcel adjoining the street right of way.
  11. Match lines clearly shown and referenced.
  12. Curve data for all horizontal curves. BC's, EC's, BCR's and ECR's shall be labeled and stationed, (convention for BCR's and ECR's - proceed clockwise around the return from BCR to ECR).
  13. Identification of all storm drains.
  14. Drywell locations.

IV - 9