- Stationing shall read from left to right. Negative stationing is not acceptable. Stationing has preference over North arrow.
- Right end of one sheet joins the left end of the next.
- All streets shall have continuous stationing. Where possible, continue stationing from previously approved plans.
- The first sheet shall be a Title Sheet and include:
- a.Location map showing the following:
- Project location.
- Major cross streets.
- City Limit lines if near project.
- North arrow and scale.
- b.Index map showing the following:
- Street configuration within project.
- Lot configurations and lot numbers, if project is a subdivision.
- Project and Phase boundaries.
- Street names.
- Index of sheets.
- City limit lines, if near project.
- North arrow.
IV - 6