- e.Over-excavated lots shall be identified in the report.
- f.Final recommendations for expansive soils and soluble sulfates shall be in the report.
- g.Final foundation design recommendations shall be in the report, including seismic design criteria.
- h.Depth of soil over-excavation shall be in the report.
- i.Results of laboratory and field tests.
- j.Plan showing locations of soils test.
- k.Certification of lots by the Soils Engineer (GE/RCE)
- A separate letter shall be prepared that identifies the lots on which soils investigations will be required for future additions.
Ⅲ-9