Over-excavated lots shall be identified in the report.
Final recommendations for expansive soils and soluble sulfates shall be in the report.
Final foundation design recommendations shall be in the report, including seismic design criteria.
Depth of soil over-excavation shall be in the report.
Results of laboratory and field tests.
Plan showing locations of soils test.
Certification of lots by the Soils Engineer (GE/RCE)
A separate letter shall be prepared that identifies the lots on which soils investigations will be required for future additions.
Ⅲ-9