[ ] Private Engineer's Responsibility Statement.
[ ] Earthwork volumes - cut, fill, over-excavation, backfill, export and import. Backup calculations and cross sections should be provided.
[ ] Details - sideyard swales, paved swales, rear yard swales, rough grade section, berm section, wall section, typical lot grading.
[ ] Has a Storm Water Pollution Prevention Plan (SWPPP) been prepared? Prior to issuance of a Grading Permit, the applicant shall file a Notice of Intent with the Lahontan Region of the California Regional Water Quality Control Board to comply with the applicable National Pollution Discharge Elimination System (NPDES) requirements.
II-17