1. The following notes shall be placed on the Erosion Control plans:
  2. In case of emergency call _____
  3. A standby crew for emergency work shall be available at all times. Necessary materials shall be available on-site and stockpiled at convenient locations to facilitate rapid construction of temporary devices or to repair any damaged erosion control measures.
  4. Erosion control devices shall not be moved or modified without the approval of the City Engineer.
  5. All removable protective devices shown shall be in place at the end of each working day in the period from October 1 through April 15, and at any other period when the weather forecast indicates a greater than 50% probability of rain.
  6. After a rainstorm, all silt and debris shall be removed from check berms and desiliting basins. Any graded slope surface protection measures damaged during the rainstorm shall also be repaired immediately.
  7. Fill slopes at the project perimeter must drain away from the top of the slope at the conclusion of each working day.
  8. A six-foot high perimeter fence or a 24-hour guard shall be posted on the site whenever the depth of water in any device exceeds 18 inches.
  9. Placement of devices to reduce erosion damage within the project must be shown on the plan. Stockpile locations for materials shall also be indicated on the drawing.
  10. Outlet conditions from the desilting basin shall not exceed downstream limitations. The overflow shall be designed to safely pass 1.5 times the 25-year peak discharge.