Right Of Way

MAJOR HIGHWAY

NOTES...

  1. Amount Of Base And Pavement Will Be Determined By A Soll Test. Subdivider's Engineer Shall Provide Test After Streets Have Been Rough Graded. The Plans Must Be Revised To Show Actual Pavement And Base To Be Constructed. Base Material And Placement Shall Conform To The Standard Specifications For Public Works Construction. The Crushed Aggregate Base Shall Consist Entirely Of Crushed Rock And Rock Dust.
  2. Variable Thickness A.C. Pavement To Be Constructed In Two Courses.
  3. See City Of Polmdale Std. No. S-2 For Cross-Fall Dimensions.

CITY OF PALMDALE...

Typical Street Section Std. No. S-1.3

Approved City Engineer Date

第一题 A.1