- g.Where excess dirt is to be placed.
- h.Building or structure setbacks per approved site plan.
- i.All drainage structures and reference to street or storm drain plans for construction details.
- j.Location and complete details of any detention, retention or retarding basins and drywells.
- k.Top and toe of all cut and fill slopes and setback from permit boundary.
- Location and complete details of subdrainage systems according to approved soils report.
- m.Signature blocks; Recommended By and Checked By on all sheets. City Engineer Approval block only on the Title Sheet/Face Sheet).
- n.Show locations and structural details of all walls, both retaining walls and free standing walls. All wall details are to be shown on the grading plan only.
- o.North arrow and scale, $1" = 40'$ minimum, include bar scale.
- If construction occurs between November 1 to April 15, then the last sheet of the Grading Plan set shall be an erosion control plan (one sheet only). See Section 2-E (Page II-13) for more details.
Ⅱ-6