• Where excess dirt is to be placed.
  • Building or structure setbacks per approved site plan.
  • All drainage structures and reference to street or storm drain plans for construction details.
  • Location and complete details of any detention, retention or retarding basins and drywells.
  • Top and toe of all cut and fill slopes and setback from permit boundary.
  • Location and complete details of subdrainage systems according to approved soils report.
  • Signature blocks; Recommended By and Checked By on all sheets. City Engineer Approval block only on the Title Sheet/Face Sheet).
  • Show locations and structural details of all walls, both retaining walls and free standing walls. All wall details are to be shown on the grading plan only.
  • North arrow and scale, $1" = 40'$ minimum, include bar scale.
  • If construction occurs between November 1 to April 15, then the last sheet of the Grading Plan set shall be an erosion control plan (one sheet only). See Section 2-E (Page II-13) for more details.