Where excess dirt is to be placed.
Building or structure setbacks per approved site plan.
All drainage structures and reference to street or storm drain plans for construction details.
Location and complete details of any detention, retention or retarding basins and drywells.
Top and toe of all cut and fill slopes and setback from permit boundary.
Location and complete details of subdrainage systems according to approved soils report.
Signature blocks; Recommended By and Checked By on all sheets. City Engineer Approval block only on the Title Sheet/Face Sheet).
Show locations and structural details of all walls, both retaining walls and free standing walls. All wall details are to be shown on the grading plan only.
North arrow and scale, $1" = 40'$ minimum, include bar scale.
If construction occurs between November 1 to April 15, then the last sheet of the Grading Plan set shall be an erosion control plan (one sheet only). See Section 2-E (Page II-13) for more details.