[ ] Call LA County Sanitation District for methods of joining trunk sewer lines.

[ ] Center plan under profile.

[ ] Ink all house laterals and wyes on back of sheet. All H.L. to be constructed to R/W line if main line is more than 5 feet from R/W.

[] *Station normal house laterals with respect to connection at main line sewer and at end (at R/W) with respect to main line sewer.

[ ] *Design engineer must consult with railroad company for design requirements and permits when a sewer passes under RR tracks. Steel jacking is required per STD. S-37.

[ ] Four-inch house laterals may be used in single family subdivisions. Six-inch house laterals to be used in all other cases.

[ ] Dash facilities when shown elsewhere on plans.

VII-6