SEWER IMPROVEMENT PLAN CHECKLIST PLAN AND PROFILE SHEET

PLAN VIEW: lprime = 40prime

[ ] North arrow (to top or right), plan must be drawn accurately to scale.

[ ] *Existing improvements and utilities shown dashed, limits of construction for existing and new.

[ ] Street names, street widths with street dimensions and main sewer and water location with reference to street centerline.

[] Stationing of at least one lot line per block each side of street.

[ ] Tract boundary, tract number, lot lines and numbers, adjacent tract or parcel numbers

[ ] *Pad elevations and lot numbers.

[] *Stationing of main sewer lines. Low points will be start of stationing and increase with rise of main sewer line. At junction of independently stationed main sewer lines, an equation shall be used to show relation.

[ ] *Locations of water lines to be per latest design of water plans.

[ ] *Invert elevations of utility crossings.

[ ] Lot dimensions and length of curve on curb return.

[ ] *As-Built stationing of existing main sewer lines, continue to use as-built stationing, if practical.

[ ] *Reference PC numbers for existing main sewer lines and Sanitation District designation for trunk sewer lines.