Equipment or materials installed or furnished without prior approval of the City Landscape Architect may be rejected and the Contractor required to remove such materials from the site at his own expense.
a. The Contractor shall dimension from two permanent points of reference (building comers, sidewalks, road intersections, etc.) the location of the following items:
connection to existing water lines;
connection to existing electrical power;
gate valves;
routing of sprinkler pressure lines;
sprinkler control valves;
quick coupling valves;
On or before the final inspection, the Contractor shall deliver the corrected and completed sepias to the City Landscape Architect. Delivery of the sepias will not relieve the Contractor of the responsibility of furnishing required information that may be omitted from the prints.
Record drawings shall be approved by the City Landscape Architect before controller charts are prepared.
Provide one controller chart for each controller supplied. The chart shall indicate the area controlled by the automatic controller and shall be the maximum size which can be stored within the controller cabinet door without folding.
VI-11