and toe of all cut and fill slopes.
Signature block for plan checker (plan checker will sign all sheets, City Landscape Architect will sign only the Title Sheet).
North arrow and scale, 1prime prime = 20 scale minimum, include bar scale.
Landscape contractor shall obtain a Landscape Permit from the Landscape Architect's office prior to commencement of work.
All work shall conform to Standard Specifications for Public Works Construction (SSPWC), latest edition, (published by Building News, 3055 Overland Avenue, Los Angeles, CA) for all work performed and not specifically mentioned herein.
5. No work shall commence on the project until a pre-construction conference has been held with the City Landscape Architect or an authorized representative.
| Pre-construction conference | 48 hrs. notice |
|---|
| Mainline inspection | 48 hrs. notice |
|---|
| Coverage, soil amendments | 48 hrs. notice |
|---|
| and plant material | |
|---|
| Final walk through for completion of improvements | 7 days notice |
|---|
| Final walk through for acceptance into the LMAD | 7 days notice |
|---|
VI-4