[ ] Nodes labeled and consistent with report.

[ ] Storm drain facilities clearly shown.

[ ] Pertinent discharge data.

[ ] Flow lines used in calculations.

[ ] Basin location and type of basin noted.

[ ] Emergency spillway.

[ ] Proposed road system clearly shown.

[ ] Street grades noted.

[ ] Typical street sections.

Hydrology Calculations

[ ] Sealed and signed by RCE with expiration date noted.

[ ] Initial time of concentration calculations or appropriate nomograph.

[ ] Predevelopment hydrographs at downstream end of project for 2-, 10- and 25-year storms (project only and combined with upstream drainage basin).

[ ] Postdevelopment hydrographs at downstream end of project for 2-, 10- and 25-year storms (project only and combined with upstream drainage basin).