| Project Details |
| Work Type | BarrierFence/VerticalNet |
|---|
| Phase | Completed |
|---|
| Project Start | January 2021 |
|---|
| City | St. Petersburg |
|---|
| County | Pinellas |
|---|
| Road | I-275Skyway BridgeSunshineSkyway |
|---|
| Construction Cost | $3,408,000 |
|---|
| Estimated Completion | Summer 2021 |
|---|
| Contractor | Southern Road & Bridge, LLC |
|---|
Contact Information
Project Information
Brent Dustin 727-575-8300
Brent.Dustin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The Florida Department of Transportation (FDOT) has reviewed multiple options to successfully deter suicide attempts on the Sunshine Skyway Bridge while preserving the iconic design.
Technology advancements will allow the necessary inspection equipment to reach over and under the bridge and the Skyway Vertical Net to continue bridge inspections.
The Skyway Vertical Net will be a vertical barrier placed on the outside barrier wall of the bridge. Construction is expected to finish in the summer of 2021.