# Pasco County Sidewalk Gaps - Various Locations 450970-1-52-01
Project Details
| Project Details |
| Work Type | Sidewalk |
| Phase | Completed |
| Limits | 1) Land O' Lakes Blvd from north of Gator Lane to north of Causeway Blvd. and 2) SR 54 from east of Northpointe Pkwy to east of Hackberry Sq |
| Project Start | September 11, 2025 |
| Length | 0.846 miles |
| City | Land O' Lakes Lutz |
| County | Pasco |
| Road | Land O' Lakes Boulevard SR 54 US 41 |
| Construction Cost | $644,000 |
| Estimated Completion | early 2026 |
| Contractor | Alexander Design + Build, LLC |
| Contact Information |
| Project Information |
| John McShaffrey\n813-975-6930 | john.mcshaffrey@dot.state.fl.us |
| Media Contact |
| Kayla Mejia\n813-975-6060 | Kayla.Mejia@dot.state.fl.us |
| |
## About
## As of January 25, 2026, all construction activities associated with this project have been completed
This project built concrete sidewalks at two locations:
1. A 6-foot-wide sidewalk on the west side of US 41 (Land O'Lakes Boulevard) from north of Gator Lane to Sabal Palm Court.
2. A 5-foot-wide sidewalk on the north side of SR 54 from east of Bexley Village Drive to west of Crestbend Boulevard.
The project also included new concrete driveways, drainage improvements, pavement markings, and new signs.