| About |
| This project will increase pedestrian safety by installing a new mid-block crosswalk on SR 590 (14th Avenue S) at 7th Street S in Pinellas County. |
| The crossing will be equipped with Rectangular Rapid Flashing Beacons (RRFBs), which help alert motorists to the presence of pedestrians. |
| Additional work includes curb and sidewalk improvements, along with new signage and pavement markings to enhance the visibility and accessibility of the crossing. |
| Construction activities are expected to begin in fall 2026. |