# US 41 (SR 45) Widening from Arlington Street to Louisiana Lane 257165-6-52-01
| Project Details |
| Work Type | Add Lanes and Reconstruct |
| Phase | Design |
| Limits | US 41 (SR 45) from north of E Arlington Street to north of E Louisiana Lane |
| Length | 0.7 miles |
| City | Hernando Inverness |
| County | Citrus |
| Road | Florida Avenue (Citrus) US 41 |
| Contact Information |
| Design Manager
Eyra Cash, PE
813-975-6164
Eyra.Cash@dot.state.fl.us |
| Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us |
Map data ©2026
## About
The purpose of this project is to reconstruct and widen US 41 from the existing two-lane configuration to a four-lane divided road with a raised median.
The proposed improvements include adding bicycle lanes, building sidewalks on both sides of the road, constructing a new pond site, and installing traffic signals and roadway lighting at the intersection of US 41 and N Independence Highway.