SR 60 (E Brandon Boulevard) Resurfacing from east of Lithia Pinecrest to west of Valrico Road 451455-1-52-01

Project Details
Work TypeResurfacing
PhaseDesign
LimitsSR 60 (E Brandon Boulevard) from east of Lithia Pinecrest to west of Valrico Road
Length1.6 miles
CityBrandon
CountyHillsborough
RoadBrandon Boulevard SR 60

Contact Information

Design Manager

Jason Jordan

813-975-6169

Jason.Jordan@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (S.R.) 60 in Hillsborough County.

In addition to resurfacing, the project includes safety improvements, signing and pavement markings, intersection improvements, ADA improvements, pedestrian crossing improvements, and minor drainage work.

Construction is currently anticipated to begin in Summer 2028.