===== PAGE 1 =====
# SR 60 Corridor Study from Shore Drive to Rocky Point Drive 454711-1
Project Details
| Work Type | Corridor Study |
| Phase | Study |
| Limits | SR 60 from Shore Drive to Rocky Point Drive |
| Length | 7.8 miles |
| City | Clearwater |
| County | Pinellas |
| Road | SR 60 |
| Contact Information |
| Study Manager |
| Eyra Cash | 813-975-6164 |
| Eyra.Cash@dot.state.fl.us |
| Media Contact |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
Map data ©2025 Google, INEGI
## About
The Florida Department of Transportation (FDOT) District Seven is conducting the State Road 60 Corridor Study to evaluate travel time reliability for vehicular travel, enhance multimodal access and connectivity, and safety improvements in Pinellas County, Florida.
The Study will also analyze options to improve the SR 60 at Belcher Road intersection.