Tampa Bay Florida Department of Transportation
SR 60 Corridor Study from Shore Drive to Rocky Point Drive 454711-1
Project Details
Work TypeCorridor Study
PhaseStudy
LimitsSR 60 from Shore Drive to Rocky Point Drive
Length7.8 miles
CityClearwater
CountyPinellas
RoadSR 60
Contact Information
Study Manager
Eyra Cash 813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The Florida Department of Transportation (FDOT) District Seven is conducting the State Road 60 Corridor Study to evaluate travel time reliability for vehicular travel, enhance multimodal access and connectivity, and safety improvements in Pinellas County, Florida.
The Study will also analyze options to improve the SR 60 at Belcher Road intersection.