===== PAGE 1 =====
# US 92 Repaving from Eureka Springs Road to Thonotosassa Road 450339-1-52-01
| Project Details |
| Work Type | Repaving, Safety Improvements |
| Phase | Design |
| Limits | US 92 from Eureka Springs Road to Thonotosassa Road |
| Length | 12.5 Miles |
| City | Dover Mango Plant City Seffner |
| County | Hillsborough |
| Road | Baker Street Hillsborough Avenue US 92 |
| Contact Information |
| Design Manager
Jason Jordan
813-975-6169
Jason.Jordan@dot.state.fl.us |
| Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us |
## About
Guardrail installation and replacement, sidewalk improvements, signing and pavement markings, signalization, lighting, ITS, and miscellaneous structures are also included as part of this project.
This project will repave over 12 miles of asphalt pavement along US 92 in Hillsborough County.
The project is currently in the design phase. Construction is anticipated to begin in Spring 2027.