# VELCOME
# to the Public Hearing for I-75 from north of Golden Gate Parkway in Collier County to south of Alico Road in Lee County
Visit us at: https://www.swflroads.com/project/452544-1
===== PAGE 2 =====
## PROJECT BENEFITS
Improve Traffic Flow & Reduce Delays
Increase Safety
for Drivers
Support Local Businesses & Economic Development
Strengthen
Transportation Network
Enhance Travel
Time Reliability
Reduce Evacuation & Emergency Response Times
===== PAGE 3 =====
## AUXILIARY LANES
## WHAT ARE AUXILIARY LANES?
An auxiliary lane allows you to travel from one entrance ramp to the next exit ramp without entering the main flow of traffic.
## AUXILIARY LANE BENEFITS
Smoother merging: Gives entering and exiting drivers more room to adjust their speed and merge.
Better traffic flow: Helps keep through traffic moving by separating some merging and exiting movements from the main travel lanes.
Less weaving: Reduces the need for vehicles entering and exiting the interstate to cross paths in a short distance.
Improved connectivity: Provides additional roadway capacity between interchanges and helps manage traffic in busy areas.
===== PAGE 4 =====
## HOW TO SHARE YOUR COMMENTS
## IN-PERSON
Provide written comments on the comment form or during the presentation and verbal comment
## EMAIL
1751 improvements@atkinsrealis.com
## PROJECT WEBSITE
www.swflroads.com/project/452544-1
## MAIL
FDOT District 1 Corridors Program Office
465 E. Main St.
Bartow, FL 33830
Comments must be postmarked or received by November 10, 2026 to be included in the formal hearing record.
===== PAGE 5 =====
## PROJECT IMPROVEMENTS
## ADDITIONAL IMPROVEMENTS BEING CONSIDERED FOR CONGESTION RELIEF:
New auxiliary lanes in both directions between Golden Gate Parkway and Alico Road
WE WANT YOUR INPUT!
## PREVIOUSLY APPROVED IMPROVEMENTS:
Resurfacing I-75 from Golden Gate Parkway to Alico Road
Adding express lanes in both directions:
Two express lanes from Golden Gate Parkway to Corkscrew Road
One express lane through the Corkscrew Road interchange
New diverging diamond interchange (DDI) at Immokalee Road
===== PAGE 6 =====
# PROJECT LOCATION
Share your thoughts on the new auxiliary lanes between Golden Gate Parkway and Alico Road.
PROPOSED IMPROVEMENTS LEGEND
Auxiliary Lanes
2 Express Lanes
1 Express Lanes
===== PAGE 7 =====
## PROPOSED TYPICAL SECTIONS
## GOLDEN GATE TO CORKSCREW
## CORKSCREW TO ALICO
These designs are conceptual only and subject to change.
===== PAGE 8 =====
# MOVING FLORIDA FORWARD INFRASTRUCTURE INITIATIVE
## MOVING FLORIDA FORWARD Infrastructure Initiative
## CONGESTION RELIEF PROJECTS
1 U.S. 98 from R. Jackson Blvd. to Hathaway Bridge
2 SW 10th St.
Golden Glades Interchange
3 1-75 at Pine Ridge Rd. Interchange
1-4 from ChampionsGate to Osceola Pkwy.
4 1-75 from Golden Gate Pkwy. to Corkscrew Rd.
5 S.R. 29 from C.R. 846 E to New Market Rd.
Poinciana Parkway Ext.
Connector from C.R. 532 to
S.R. 429
6 S.R. 29 from New Market Rd to S.R. 82
1-275 from 38th Ave. N to 4th St. N
5 1-4 at S.R. 33 Interchange
7 I-10 from Eastbound weigh station to Nine Mile Rd.
16 I-4 from U.S. 27 to ChampionsGate
8 S.R. 263 from S.R. 61 to C.R. 2203
1-75 at Fruitville Rd. Interchange
S.R. 70 from Bourneside Blvd. to Waterbury Rd.
1-75 Auxiliary Lanes from S.R. 44 to S.R. 326
W Midway Rd. from Glades Cut Off Rd. to Jenkins Rd.
U.S. 301 Realignment from C.R. 470 to Florida's Turnpike I-95 at U.S. 1 Interchange in Volusia Co.
@MyFDOT
@MyFDOT
## Orlando Area Inset
## Tampa Bay Inset
09/22/2023
Subject to change.
Listed alphabetically by
county.
===== PAGE 9 =====
## MOVING FLORIDA FORWARD INFRASTRUCTURE INITIATIVE
• The 2023 Florida Legislature approved the Moving Florida Forward Infrastructure Initiative to address critical state roadway needs.
• FDOT selected key projects, including previously approved but unfunded ones with community support.
• $4 billion from the state surplus is dedicated to accelerate construction and improve safety, congestion, and resiliency.
• The initiative responds to rapid population growth, projected at 1,000 new residents per day for 30 years.
• Investments focus on major interstates and arterial roads to support the movement of people and goods.
• Combined with FDOT's ongoing work program, Florida's five-year transportation budget now totals $66.1 billion.
• In Southwest Florida, this includes the I-75 at Pine Ridge Road Interchange Improvements in Naples, and I-75 from Golden Gate Parkway to Alico Road.