| Project Details | About | |
| Work Type | Striping | FINAL ACCEPTED EFFECTIVE: MARCH 11, 2021 |
|---|---|---|
| Phase | Completed | This project will install Dynamic Envelopes at multiple railroad crossings in eastern Hillsborough County. |
| Project Start | February 2021 | The crossings include 2- SR 60 (Valrico and Hopewell), 2- Alexander St (SR 39), 2- US 92 (Reynolds St. and Baker St.) |
| City | Hopewell Plant City Valrico | Dynamic envelopes are roadway markings used to increase safe stopping behavior and safety for both vehicular and pedestrian traffic at grade rail crossings. These markings indicate the clearance needed for trains to safely pass. |
| County | Hillsborough | |
| Road | Alexander Street Baker Street Reynolds Street SR 39 SR 60 US 92 | By keeping vehicles outside of the dynamic envelopes, fewer vehicles will be stopped too close to or actually on the tracks, thereby reducing the danger to vehicles, occupants, train crews, passengers and bystanders. |
| Construction Cost | $71,400 | The goal is to positively influence driver behavior and reduce the number of incidents and injuries sustained at rail crossings. |
| Estimated Completion | Spring 2021 | The project is expected to finish in the spring 2021. |
| Contractor | AKCA. LLC | |
Contact Information
Project Information
Kouser Manzer 813-612-3200 Kouser.Manzer@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us