===== PAGE 1 =====
## PROJECT OVERVIEW
The Florida Department of Transportation (FDOT) is improving I-75 in Collier and Lee counties to help address growing congestion and support the region's long-term growth. This project is part of the Moving Florida Forward Infrastructure Initiative, a statewide effort to deliver congestion relief faster and more efficiently.
## PROJECT BENEFITS
Reduced Congestion
Improved Safety
More Reliable Travel Times
Long-term Funding for Transportation Improvements
## WHAT ARE EXPRESS LANES?
Express lanes are optional toll lanes added to an existing highway to provide drivers with a more reliable travel option during periods of congestion. General-purpose lanes remain free and available to everyone.
## EXPRESS LANE BENEFITS
Congestion relief for all drivers
Faster and more reliable travel
Funding and long-term sustainability
Encouraging carpooling and shared trips
Environmental benefits
Flexible traffic management
## STAY CONNECTED
## Scan to
access project updates, schedules, and key resources
If you have questions about the project, please contact:
FDOT's Interstate Community Outreach Team
239-322-3131 175Improvements@atkinsrealis.com
Interstate Community Outreach Manager
Brian Bollas ☑ Brian.Bollas@dot.state.fl.us
Interstate Community Outreach Manager
Jennifer Dorning ☑ Jennifer.Dorning@dot.state.fl.us
## ADDITIONAL IMPROVEMENTS BEING CONSIDERED FOR CONGESTION RELIEF
New auxiliary lanes in both directions between Golden Gate Parkway and Alico Road
Resurfacing I-75 from Golden Gate Parkway to Alico Road
- 4 p.m.
- 4:30 p.m.
## PREVIOUSLY APPROVED IMPROVEMENTS
Adding express lanes in both directions:
• Two express lanes from Golden Gate Parkway to Corkscrew Road
## HEARING SCHEDULE
• One express lane through the Corkscrew interchange
New diverging diamond interchange (DDI) at Immokalee Road
Open House
Formal Presentation & Verbal Comment
## HOW TO SHARE YOUR COMMENTS
• In-Person: Provide written comments on the comment form or during the presentation and verbal comment
• Email: 175lprovements@atkinsrealis.com
- Project Website: https://www.swflroads.com/project/452544-1
• Mail: FDOT District 1 Corridors Program Office
465 E. Main St. Bartow, FL 33830
Comments must be postmarked or received by November 10, 2026 to be included in the formal hearing record.
## WHAT ARE AUXILIARY LANES?
An auxiliary lane allows you to travel from one entrance ramp to the next exit ramp without entering the main flow of traffic.
## AUXILIARY LANE BENEFITS
Smoother merging: Gives entering and exiting drivers more room to adjust their speed and merge.
Better traffic flow: Helps keep through traffic moving by separating some merging and exiting movements from the main travel lanes.
Less weaving: Reduces the need for vehicles entering and exiting the interstate to cross paths in a short distance.
Improved connectivity: Provides additional roadway capacity between interchanges and helps manage traffic in busy areas.
===== PAGE 2 =====
I-75 from Golden Gate Parkway to Corkscrew Road Typical Section
PROPOSED TYPICAL SECTIONS
I-75 from Corkscrew Road to Alico Road Typical Section