===== PAGE 1 ===== ## PROJECT OVERVIEW The Florida Department of Transportation (FDOT) is improving I-75 in Collier and Lee counties to help address growing congestion and support the region's long-term growth. This project is part of the Moving Florida Forward Infrastructure Initiative, a statewide effort to deliver congestion relief faster and more efficiently. ## PROJECT BENEFITS
Image
Reduced Congestion
Image
Improved Safety
Image
More Reliable Travel Times
Image
Long-term Funding for Transportation Improvements ## WHAT ARE EXPRESS LANES? Express lanes are optional toll lanes added to an existing highway to provide drivers with a more reliable travel option during periods of congestion. General-purpose lanes remain free and available to everyone. ## EXPRESS LANE BENEFITS
Image
Congestion relief for all drivers
Image
Image
Faster and more reliable travel Funding and long-term sustainability
Image
Image
Encouraging carpooling and shared trips Environmental benefits
Image
Flexible traffic management ## STAY CONNECTED
Image
## Scan to access project updates, schedules, and key resources If you have questions about the project, please contact: FDOT's Interstate Community Outreach Team 239-322-3131 175Improvements@atkinsrealis.com Interstate Community Outreach Manager Brian Bollas ☑ Brian.Bollas@dot.state.fl.us Interstate Community Outreach Manager Jennifer Dorning ☑ Jennifer.Dorning@dot.state.fl.us
Image
Image
Image
Image
## ADDITIONAL IMPROVEMENTS BEING CONSIDERED FOR CONGESTION RELIEF
Image
New auxiliary lanes in both directions between Golden Gate Parkway and Alico Road Resurfacing I-75 from Golden Gate Parkway to Alico Road - 4 p.m. - 4:30 p.m. ## PREVIOUSLY APPROVED IMPROVEMENTS
Image
Adding express lanes in both directions: • Two express lanes from Golden Gate Parkway to Corkscrew Road ## HEARING SCHEDULE • One express lane through the Corkscrew interchange
Image
New diverging diamond interchange (DDI) at Immokalee Road
Image
Open House Formal Presentation & Verbal Comment ## HOW TO SHARE YOUR COMMENTS • In-Person: Provide written comments on the comment form or during the presentation and verbal comment • Email: 175lprovements@atkinsrealis.com - Project Website: https://www.swflroads.com/project/452544-1 • Mail: FDOT District 1 Corridors Program Office 465 E. Main St. Bartow, FL 33830 Comments must be postmarked or received by November 10, 2026 to be included in the formal hearing record. ## WHAT ARE AUXILIARY LANES? An auxiliary lane allows you to travel from one entrance ramp to the next exit ramp without entering the main flow of traffic. ## AUXILIARY LANE BENEFITS
Image
Smoother merging: Gives entering and exiting drivers more room to adjust their speed and merge.
Image
Better traffic flow: Helps keep through traffic moving by separating some merging and exiting movements from the main travel lanes.
Image
Less weaving: Reduces the need for vehicles entering and exiting the interstate to cross paths in a short distance.
Image
Improved connectivity: Provides additional roadway capacity between interchanges and helps manage traffic in busy areas. ===== PAGE 2 =====
Image
Image
I-75 from Golden Gate Parkway to Corkscrew Road Typical Section
PROPOSED TYPICAL SECTIONS
I-75 from Corkscrew Road to Alico Road Typical Section