===== PAGE 1 ===== ## SR 586 (Curlew Road) Repaving from Talley Drive to Tampa Road 441657-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitseast of Talley Dr. to Tampa Rd.
Project StartJanuary 17, 2023
Length2.4 miles
CityClearwater
CountyPinellas
RoadCurlew Road SR 586
Construction Cost$9 million
Estimated CompletionSummer 2024
ContractorPreferred Materials, Inc.
Contact Information
Project Information
Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
Image
Map data ©2024 Google ## About As of April 18, 2024, all construction activities associated with this project have been completed. This project is repaving SR 586 (Curlew Road) between Talley Drive and Tampa Road in Clearwater. In addition to repaving the roadway, sidewalks will be upgraded to meet ADA and the traffic signal at McMullen Booth Road will be replaced with hurricane resistant poles. Construction is underway and is anticipated to be complete in the summer of 2024.