| Project Details |
| Work Type | Repaving |
|---|
| Phase | Completed |
|---|
| Limits | east of Talley Dr. to Tampa Rd. |
|---|
| Project Start | January 17, 2023 |
|---|
| Length | 2.4 miles |
|---|
| City | Clearwater |
|---|
| County | Pinellas |
|---|
| Road | Curlew Road SR 586 |
|---|
| Construction Cost | $9 million |
|---|
| Estimated Completion | Summer 2024 |
|---|
| Contractor | Preferred Materials, Inc. |
|---|
As of April 18, 2024, all construction activities associated with this project have been completed.
This project is repaving SR 586 (Curlew Road) between Talley Drive and Tampa Road in Clearwater. In addition to repaving the roadway, sidewalks will be upgraded to meet ADA and the traffic signal at McMullen Booth Road will be replaced with hurricane resistant poles.
Construction is underway and is anticipated to be complete in the summer of 2024.