===== PAGE 1 ===== # I-275 Resurfacing from south of Nebraska Avenue to Pasco County Line 449155-1-32-01
Project Details
Work TypeResurfacing
PhaseDesign
LimitsI-275 from south of Nebraska Avenue to Pasco County Line
Length7.1 miles
CityLutz
CountyHillsborough
RoadI-275
Contact Information Design Manager Dinyar Sharifabad (813) 975-6172 Dinyar.Sharifabad@dot.state.fl.us Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
Image
Map data ©2025 Google ## About The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of Interstate 275 (I-275) in Hillsborough County. In addition to resurfacing, the project also includes restriping of bridges, guardrail/bridge end treatment upgrades, and replacement of fence along right of way as needed. Construction is currently anticipated to begin in Spring 2028.