I-275 Resurfacing from south of Nebraska Avenue to Pasco County Line 449155-1-32-01

Project Details

Work TypeResurfacing
PhaseDesign
LimitsI-275 from south of Nebraska Avenue to Pasco County Line
Length7.1 miles
CityLutz
CountyHillsborough
RoadI-275

About

The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of Interstate 275 (I-275) in Hillsborough County.

Contact Information

Design Manager

  • Dinyar Sharifabad
  • 975-6172
  • Dinyar.Sharifabad@dot.state.fl.us

In addition to resurfacing, the project also includes restriping of bridges, guardrail/bridge end treatment upgrades, and replacement of fence along right of way as needed.

Construction is currently anticipated to begin in Spring 2028.

Media Contact

Kayla Mejia

813-975-6060