| Project Details | |
| Work Type | Widening and New Road Construction |
|---|---|
| Phase | Completed |
| Limits | From Uradco Place to west of Fort King Road |
| Project Start | November 2019 |
| Length | 7 miles |
| City | Dade City San Antonio |
| County | Pasco |
| Road | SR 52 |
| Construction Cost | $84 million |
| Estimated Completion | Summer 2024 |
| Contractor | Superior Construction Company Southeast, LLC |
As of July 24, 2024, all work was completed and this project was final-accepted from the contractor.
Contact Information
Project Information
John McShaffrey 813-975-6930
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
This project widened and realigned SR 52 from Uradco Place to Fort King Road in eastern Pasco County. All work in the original project contract has been completed.
Tasks were added to improve safety and operations -- widening and drainage work was done on westbound SR 52 approaching I-75 to construct a low-profile 4-foot-wide concrete separator between the SR 52 thru-lanes and the lane leading to the southbound I-75 entrance ramp. Milling, repaving, and pavement markings were also done in this area to complete the project.
A development permit - not associated with the project - is installing a traffic signal at Pasco Road.
Original project work:
Clinton Avenue between Pasadena Avenue and US 301 is now part of the new SR 52.
The section of the former SR 52 between Bayou Branch Canal (west of Mirada Blvd.) and US 301 is now designated CR 52.