| Project Details |
| Work Type | Repaving |
|---|
| Phase | Construction |
|---|
| Limits | at the
Southbound
Skyway Toll
Plaza |
|---|
| Project Start | Fall 2026 |
|---|
| Length | 1 mile |
|---|
| Road | I-275 |
|---|
| Construction
Cost | $655,000 |
|---|
| Contractor | Pigott Asphalt
and Sitework
LLC |
|---|
About
This project will repave I-275 through the southbound Skyway toll plaza in Pinellas County.
Lane closures and traffic shifts can be expected as crews pave all lanes and the shoulder areas through the toll plaza. Be sure to subscribe to receive construction notifications via email.
Once final configuration is in place, traffic will continue to move through the toll plaza. The two inside lanes will accommodate most vehicles, while the outside lane will be designated for wide-load vehicles. The speed limit through the plaza will remain at 25 mph.
Work zone safety is everyone's job! Click to learn more: Work Zone Safety It's Everyone's Job
Construction is currently anticipated to begin in fall of 2026.
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 456549-1-52)
Last Updated: 07/30/2026