| Project Details | |
| Work Type | Widening |
|---|---|
| Phase | Design |
| Limits | From North of I-375 to North of 38th Avenue North |
| Length | 2 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | I-275 |
This project will widen I-275 between I-375 to 38th Avenue N. to provide two tolled express lanes in each direction.
Contact Information
Design Manager
Helena Ly
813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
This project will also include lane continuity and operational improvements. The roadway and bridges will be widened, and noise barriers will be built.
This project is currently in the design phase.
Construction is not currently funded.