===== PAGE 1 =====
# US 301 Reconstruction from Hillsborough/Pasco County Line to south of SR 56 255796-3-52-01
| Project Details |
| Work Type | Add Lanes and Reconstruct |
| Phase | Design |
| Limits | US 301 from Hillsborough/Pasco County Line to South of SR 56 |
| Length | 1.4 miles |
| City | Zephyrhills |
| County | Pasco |
| Road | US 301 |
Contact Information
Design Manager
Amanda Dicks
813-975-3562
Amanda.Dicks@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
## Google
Map data ©2025 Google
## About
The purpose of this project is to reconstruct and widen the existing two-lane roadway to four-lane roadway of US 301.
In addition to reconstructing and widening, this project also includes signing and pavement markings and minor drainage improvements.
Other improvements include adding sidewalk and shared use path along US 301.