US 19 Repaving from Drew Street to Sunset Point Road 443780-1-52-01

Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom south of Drew Street to north of Sunset Point Road
Project StartJanuary 26, 2025
Length2 miles
CityClearwater
CountyPinellas
RoadUS 19
Construction Cost$13 million
Estimated CompletionFebruary 3, 2026
ContractorPreferred Materials Inc.

About

As of February 3, 2026, all construction activities associated with this project have been completed.

This project will repave US 19, the ramps and the frontage roads between Drew Street and Sunset Point Road in Clearwater. Other improvements include realigning existing U-turn lanes, and sidewalks and lighting upgrades.

Construction is anticipated to be complete in early 2026.

Please click on the following link to learn more about staying safe in work zones: Work Zone Safety It's Everyone's Job

Contact Information

Project Information

Maddie Griffin 727-575-8334

Maddie.Griffin@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us