Tampa Bay Florida Department of Transportation
US 41 Widening From S of Withlacoochee Trail Bridge to N of Sportsman Point 257165-4-52-01
Project Details
Work TypeWidening
PhaseDesign
LimitsFrom S of Withlacoochee Trail Bridge to N of Sportsman Point
Length1.2 miles
CityInverness
CountyCitrus
RoadFlorida Avenue (Citrus) US 41
Contact Information
Design Manager
Eyra Cash 813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to reconstruct and widen US 41 from the existing 2 lanes to a 4-lane road with median separation. The project also includes bike lanes, sidewalks, new bridges over the Withlacoochee Trail, a mid-block pedestrian crossing, and new pond sites.
The project is currently in the design phase. Construction activities are anticipated to begin late 2028.