===== PAGE 1 ===== Financial Project ID: 439434-1-52-01 & 439434-1-52-02 CONSTRUCTION PROJECT The Florida Department of Transportation will begin work on March 9, 2021 to make improvements to US 27 from Cloverleaf Road to SR 66 in Highlands County. The project length is approximately six miles. The project limits are identified below on the project location map. ## PROJECT IMPROVEMENTS Resurface US 27 from Cloverleaf Road to SR 66 Modify median openings Add left turn lanes at Lake Josephine RV Resort and Heartland Animal Hospital Install curb and gutter, signage and pavement markers Replace guardrail Improve drainage Install new traffic signals at Twitty Road and Lake Josephine Drive Estimated construction cost is $10 million
Project Location Map
Image
## PROJECT SCHEDULE Enlarged map on back page Construction begins March 9 2021; estimated completion is spring 2022 Daytime and nighttime lane closures may occur during construction on US 27 from Cloverleaf Road to SR 66, as needed, weather permitting ## PROJECT CONTRACTOR C.W. Roberts Contracting, Inc. ## CONTACT US ## STAY INFORMED by visiting www.swflroads.com/current projects For more information about the improvements, contact: Corine Burgess, Community Outreach Manager (863) 225-0422 corine.burgess@dot.state.fl.us ## JOIN US ON THE WEB Brian R. Rick, Public Information Specialist (863) 519-2828 brian.rick@dot.state.fl.us ===== PAGE 2 =====
Image