US 92 (S Dale Mabry Hwy) Repaving from Ballast Point Boulevard to Sevilla Street 443781-1-52-01

Project Details
Work TypeResurfacing
PhaseCompleted
Limitsfrom north of Ballast Point to south of Sevilla St
Project StartAugust 18, 2025
Length1.55 Miles
CityTampa
CountyHillsborough
RoadDale Mabry Highway US 92
Construction Cost$6.5 million
Estimated CompletionSummer 2026
ContractorAjax Paving Industries of Florida, LLC

About

All construction activities associated with this project were completed on Thursday, May 28, 2026.

This project repaved South Dale Mabry Highway (US 92) from north of Ballast Point Boulevard to south of Sevilla Street in South Tampa.

Other improvements included:

  • installed a directional raised median at Kensington Avenue
  • installed a raised traffic separator along the left turn lane onto El Prado Boulevard
  • installed a raised traffic separator along the median between Fair Oaks Avenue and Lawn Avenue

Contact Information

Project Information

Maricelle Venegas 813-975-6204

Maricelle.Venegas@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us