| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | US 41 (Nebraska Avenue) Resurfacing from Kennedy Boulevard to Hillsborough Avenue |
| Length | 3.18 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Nebraska Avenue (Hillsborough) SR 45 US 41 |
The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of US 41 (Nebraska Avenue) in Tampa.
Construction is anticipated to begin Fall 2028.
Contact Information
Design Manager
Digvijay Patil 813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us