| Project Details |
| Work Type | Milling and Resurfacing |
|---|
| Phase | Design |
|---|
| Limits | US 92/SR 580/Hillsborough Ave from east of Sheldon Road to east of Benjamin Road |
|---|
| Length | 2.4 miles |
|---|
| City | Tampa |
|---|
| County | Hillsborough |
|---|
| Road | Hillsborough Avenue SR 580 US 92 |
|---|
Contact Information
Design Manager
Stephanie Wolchok 813-975-6244
Stephanie.Wolchok@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of US 92 in Hillsborough County.
In addition to resurfacing, the project also includes pedestrian crossing improvements, sign and pavement markings, intersection improvements, intersection lighting and minor drainage work.
Construction is currently anticipated to begin Summer of 2029.