I-275 and Alt. US 19 Bridge Maintenance- multiple locations in Pinellas County 441468-1-52-01
| Project Details |
| Work Type | Bridge Maintenance |
|---|
| Phase | Completed |
|---|
| Limits | I-275 at SR 682 and Alt. US 19 over Long Bayou and over the Pinellas Trail |
|---|
| Project Start | October 2020 |
|---|
| City | Seminole |
|---|
| County | Pinellas |
|---|
| Road | Alt US 19 |
|---|
| Construction Cost | $657,608.32 |
|---|
| Estimated Completion | Spring 2021 |
|---|
| Contractor | M&J Construction Company of Pinellas County, Inc. |
|---|
This project will repair the bridge decks on I-275 and Alt. US 19 at the following locations in Pinellas County:
I-275 northbound ramp bridge from SR 682/Bayway
Alt. US 19 over Long Bayou in both the northbound and southbound directions
Alt. US 19 over the Pinellas Trail
Construction is expected to finish in the spring of 2021.