Tampa Bay Florida Department of Transportation
I-275 and Alt. US 19 Bridge Maintenance- multiple locations in Pinellas County 441468-1-52-01
Project Details
Work TypeBridge Maintenance
PhaseCompleted
LimitsI-275 at SR 682 and Alt. US 19 over Long Bayou and over the Pinellas Trail
Project StartOctober 2020
CitySeminole
CountyPinellas
RoadAlt US 19
Construction Cost$657,608.32
Estimated CompletionSpring 2021
ContractorM&J Construction Company of Pinellas County, Inc.
About
FINAL ACCEPTED ON MARCH 15, 2021
This project will repair the bridge decks on I-275 and Alt. US 19 at the following locations in Pinellas County:
I-275 northbound ramp bridge from SR 682/Bayway
Alt. US 19 over Long Bayou in both the northbound and southbound directions
Alt. US 19 over the Pinellas Trail
Construction is expected to finish in the spring of 2021.